YINMA Electric · Yueqing, Zhejiang

11 Heavy Truck Chargers
YINMA Equipment and Installation Guidance for a Yueqing Charging Station

YINMA supplied 11 heavy truck chargers and guided the installation. Cable laying, foundations and site civil works were carried out by the contractor.

11
Heavy Truck Chargers
Heavy Duty
Charging Application
Cable Route
Power Distribution
Yueqing
Project Location
Row of heavy truck chargers on concrete foundations at a Yueqing charging station

Heavy Truck Charging Is Not Passenger Car Charging

The Yueqing site installs 11 heavy truck chargers with a new cable route. High power, concentrated charging windows and long vehicles make the electrical and site design more demanding.

Heavy truck batteries are large, single-connector power is high, and charging windows are concentrated. Eleven chargers on one site create a load that is very different from a passenger car park: cable current, voltage drop, protection selectivity and heat all need to be checked together.

The project installs 11 heavy truck chargers with new cable laying. YINMA supplied the charging equipment and guided installation; cable laying, foundations, canopy and other civil works were carried out by the contractor.

Who Did What

YINMA supplied the chargers and guided equipment installation; the contractor carried out cable laying and civil works.

ScopeYINMA ElectricContractor
Equipment11 heavy truck chargers—
InstallationGuidance: foundation interface, cable entry, earthing, protection, commissioningFoundations, cable laying, canopy, civil works
CommissioningCharger settings, communication and charging test supportPower supply and cable termination

YINMA's role is not to replace the construction crew. It is to make sure the 11 chargers are installed correctly, connected correctly and commissioned before the station opens.

Six Checks for an 11-Charger Site

Points checked during installation and before energization.

⚡

Load Split and Voltage Drop

Divide the 11 chargers into circuits and check voltage drop on the longest run. A cable that is adequate on paper can still fail at the last charger.

🛢️

Cable Route and Bending Radius

Check trench or duct route, bending radius and pulling tension. Heavy truck chargers use large cables; damage during pulling is expensive to fix.

🚧

Foundation and Anti-Collision

The charger foundation must be level and strong enough, with bollards or barriers protecting the cabinet from truck movement.

🌩️

Earthing, Leakage and E-Stop

Verify earthing, residual current protection and emergency stop circuits for each charger group.

📡

Group Control and Metering

Check communication wiring, group control settings and metering points before the first charging session.

✅

Pre-Energization Checks

Insulation, phase sequence, protection settings and a real charging test on each unit.

From Foundations to the First Charge

Photos follow the installation sequence: cabinet placement, cable route, termination and charging modules.

Heavy truck chargers installed along a concrete plinth
Chargers installed along the concrete plinth; cable termination is in progress.
Forklift placing a heavy truck charger
Placing a charger; alignment and fixing are checked before cable connection.
Charger cabinet beside the cable trench
Cabinet handling beside the cable trench and equipment foundations.
Cable trench running along the charger row
Cable trench and route along the charger row.
Cable termination with coloured phase cables and earth
Cable termination and earthing inside the equipment cabinet.
Charging power modules and internal wiring
Charging power modules and internal wiring before commissioning.

What African Mining and Logistics Fleets Can Reuse

Heavy truck electrification is moving from pilots to fleets in African mining, ports and logistics corridors.

1. Concentrated High-Power Load

Eleven chargers create a concentrated load. Grid capacity, transformer sizing and cable sections must be checked before the first truck arrives.

2. Heat, Dust and Continuous Use

In African mining and port sites, chargers run in high ambient temperature and dust. Ventilation, filtering and maintenance access need more margin.

3. Phased Fleet Rollout

Start with a few trucks and add chargers later. The cable route and switchboard should be designed for the final fleet, not just the first phase.

For African fleet operators, the charging station is a power project: cable route, protection, earthing and load management matter as much as the chargers themselves.

Heavy Truck Charging Equipment and Guidance

YINMA supports charging stations for heavy trucks, logistics fleets and mining operations.

    • Heavy truck charger supply, single or multi-unit projects;
    • Load split and cable-route review for multi-charger sites;
    • Installation guidance for foundations, cable entry and earthing;
    • Commissioning support and charging tests.

For charger options, contact YINMA. For station design, see the selection guide. To discuss an 11-charger site, contact YINMA. For a two-substation charging project, see the Taizhou 2×1000 kVA case.

Common Questions

Q: How large a transformer does an 11-charger site need?
A: It depends on charger power, simultaneity factor and charging strategy. Do not add 11 units at full load; calculate the actual demand.

Q: How do you control voltage drop?
A: Shorten the route, increase cable section and split circuits. This must be checked at design stage, not after installation.

Q: Does YINMA lay the cables?
A: No. YINMA supplies the chargers and guides installation; cable laying and civil works are carried out by the contractor.

Heavy Truck Charging Needs a Power Design
YINMA Chargers for Fleet and Mining Sites

From a single heavy truck charger to an 11-unit station, YINMA supports fleet, port and mining charging projects with equipment and installation guidance.

قراءة إضافية

شو جيان يي في ينما إلكتريك — مؤسس وعامل خط ومشرف جودة
أخبار القطاع

جيان يي شو: مصنع محولات صيني

مؤسس ينما — ما زال على خط يويتشينغ، وآخر مفتش، والمهندس الذي يطير إلى موقع أفريقي حين يحتاج العمل ذلك.

اقرأ المقال →
57 وحدة من معدات التوزيع الكهربائية GGD LV في دراسة حالة مشروع جينغهيشنغ الصناعي
أخبار القطاع

57 GGD LV وحدات المفاتيح الكهربائية: موثوقية التوزيع الصناعي من سونغزي إلى أفريقيا

Yinma قامت شركة «إلكتريك» بتوريد 57 وحدة من لوحات التوزيع الكهربائية منخفضة الجهد من طراز GGD إلى مشروع «جينغهشينغ» الصناعي في سونغزي — وهو نموذج توزيع صناعي أثبت فعاليته في المناجم والمصانع والمجمعات الصناعية الأفريقية.

اقرأ المقال →
خط هوائي بـ 11 بحراً + محول على عمود 250 kVA: YINMA في تشجيانغ
أخبار القطاع

خط 11 بحراً + محول على عمود 250 kVA | YINMA

وفّرت YINMA محولاً على عمود 250 kVA وخزانة JP لحديقة زراعية في تشجيانغ، ونفّذ المقاول الأعمدة والخط الهوائي.

اقرأ المقال →

هل تحتاج دعماً فنياً أو عرض سعر؟

يمكن لفريق الهندسة لدينا الإجابة على أسئلتك حول هذا المقال وتقديم المواصفات والأسعار وجداول التسليم لمشروعك.

المعاملات الفنية