One 50 m Span, Two Poles
YINMA 315 kVA Pole Transformer and JP Cabinet in Qingtian
A mountainous rural site needed one 50 m overhead span on two poles, with an S13-315 pole transformer and JP cabinet. YINMA supplied the equipment and guided installation; pole erection and line work were carried out by the contractor.

A Long Span in Hilly Country
The site needed one 50 m overhead span on two poles, with an S13-315 pole transformer and JP cabinet at the end.
The project is in Qingtian, Lishui. The terrain is hilly and the load point is away from the road, so the design uses one 50 m overhead span on two poles, with an S13-315 pole transformer and JP cabinet at the end. A pole-mounted arrangement avoids a large foundation and keeps the equipment close to the load. The project uses a 315 kVA-class pole transformer (S13-315) at the end of the span.
A 50 m span is longer than a typical low-voltage distribution span. Pole strength, sag, wind load, lightning exposure and the pulling method all need to be checked together. The two poles also carry the transformer and JP cabinet, so their alignment and foundation matter as much as the conductor.
Who Did What
YINMA supplied the S13-315 transformer and JP cabinet and guided installation; poles, span and civil works were carried out by the contractor.
| Scope | YINMA Electric | Contractor |
|---|---|---|
| Equipment | S13-315 pole transformer, JP cabinet | — |
| Installation | Guidance: pole alignment, platform, JP cabinet, earthing, pre-energization | Pole erection, 50 m span, civil works |
| Testing | Witness and check equipment before energization | Site insulation and withstand tests |
YINMA's role is to make sure the transformer and JP cabinet are installed and connected correctly, and checked before the line is energized.
Six Checks for a 50 m Span
Points checked on site before energization.
Pole Alignment and Foundation
Check spacing, level and burial depth. On a 50 m span, a leaning pole increases uneven tension and sag.
Sag and Clearance
Check conductor sag and ground clearance. A long span needs more attention to sag than a standard 30–40 m span.
Transformer Platform
The platform must be horizontal and the S13-315 transformer securely fixed before conductors are tensioned.
JP Cabinet Mounting
Check mounting height, door opening, cable entry and sealing. The JP cabinet sits below the transformer on the pole.
Earthing and Lightning
Verify earth down-lead, earth electrode and surge protection. Hilltop and open-field sites have higher lightning exposure.
Pre-Energization Checks
Insulation, withstand test, phase sequence and visual inspection before closing the switch.
From Pole Setting to the Nameplate
Photos follow the work sequence: pole setting, lifting, installation, nameplate and testing.






What Hilly African Rural Sites Can Reuse
Long spans, two-pole platforms, limited transport and high lightning exposure are common in hilly rural areas.
1. Long Spans in Difficult Terrain
A 50 m span reduces the number of poles in hilly or crossed terrain, but increases sag and wind load. Pole strength and foundations must be designed for it.
2. Transport and Pole Setting
On narrow rural roads, concrete poles and transformer access are often the limiting factor. Plan the lifting method before the equipment arrives.
3. Lightning and Earthing
Hilltop and open-field sites have higher lightning exposure. Earthing and surge protection need more margin than in a built-up area.
For African rural electrification, the two-pole platform is a practical way to serve a scattered load without a large civil foundation — provided the span, poles and earthing are designed together.
Pole Transformers for Long-Span Rural Projects
YINMA supports rural distribution, agriculture and hilly-terrain projects with pole transformers and JP cabinets.
- S13-315 pole transformer and JP cabinet supply;
- Equipment selection for long-span and two-pole installations;
- Guidance on pole alignment, platform, JP cabinet and earthing;
- Pre-energization checks with the contractor and utility.
For the transformer range, see the 315 kVA oil-immersed distribution transformer. For selection, see the transformer selection guide. To discuss a long-span site, contact YINMA. For an 11-span agricultural line, see the Zhejiang 250 kVA case.
Common Questions
Q: Is a 50 m span too long for a pole transformer?
A: It depends on the line design. A 50 m span is longer than a typical LV distribution span, so pole strength, sag, wind load and clearance must be checked. It is not automatically unsuitable.
Q: What does S13-315 mean?
A: S13 is the transformer series and 315 is the capacity class in kVA. The final nameplate and settings follow the project design.
Q: Does YINMA erect poles and string the line?
A: No. YINMA supplies the transformer and JP cabinet and guides installation; pole erection, the 50 m span and civil works are carried out by the contractor.
Long Spans Need the Right Pole Transformer
YINMA S13 Pole Transformers and JP Cabinets
From a single 50 m span to a rural distribution line, YINMA supports hilly-terrain projects with equipment and installation guidance.